• Contact Us
  • About Us
Wednesday, January 14, 2026
  • Login
MetroBusinessNews
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
MetroBusinessNews
No Result
View All Result
ADVERTISEMENT
Home Economy

Fashola irked by infrastructure decay, vandalism in Lagos

metro by metro
September 3, 2017
in Economy
0
Fashola
0
SHARES
0
VIEWS

Babatunde Fashola, the Minister of Power, Works and Housing, is irked by vandalism and deterioration of infrastructure in Lagos state and called for a complete regeneration.

Fashola, who inspected roads and other infrastructure in Apapa, on Saturday, said the facilities in the area were supposed to boost the nation’s economy.

Read Also

NRS Engages KPMG As Concernrs Over Nigeria’s New Tax Laws Ease

FG Reacts To KPMG’s Criticisms Of Multiple Errors, Gaps In Newly Enacted Tax Laws

KPMG Flags Errors, Gaps In Nigeria’s New Tax Laws

He also inspected the National Stadium, Surulere, through Alaka to roads in Apapa and the Apongbon bridge to the outer Marina.

At Alaka flyover bridge, the minister instructed the team of engineers, led by the Director, Federal Highways, South-West, Mr Emmanuel Adeoye, to expedite action on the replacement of vandalised manhole covers.

He emphasised the need to restore Liverpool Road and the bridge, in order not to shut down the country.

Fashola urged the engineers to reconstruct some drains and blocked drainage channels connecting a major canal in front of the National Theatre, Iganmu, to solve flood problem causing persistent road degeneration in the area.

“Why did you have wait this long to allow this level of degeneration? If you have to do the drainage and construct some box culverts to keep the drainage flowing, please do it.

“If we lose Liverpool Road (road leading to the Tin Can Island Port and the Nigeria Ports Authority) and this place (Funsho Williams Road), we would have shut down the nation,’’ he said.

He appealed to Reynolds Construction Company (RCC), the firm handling the rehabilitation of Funsho Williams Road to the Ijora Bridge, to speed up construction.

Fashola said that the entire stretch of the road was sitting on swampy land and stressed the need to finish the construction before another rainfall.

He also instructed the contractor to replace vandalised bridge railings on the axis with concrete.
Fashola directed the team of engineers to liaise with the relevant authorities to relocate the popular Costain Bus Stop on Funsho Williams Avenue, to check gridlock and persistent road degeneration.

“This Costain Roundabout is not a bus stop, but the layby ahead,’’ he said.

While inspecting the street lights under and above the Ijora and Funsho Williams Avenue bridges, the Minister directed his engineers to liaise with Rural Electrification, to replace all the lights.

“If there are new solar technologies, adopt them. It is a total regeneration of this Apapa area,’’ he said.

While inspecting the Apapa Wharf Road Reconstruction Project, he said that President Muhammadu Buhari was happy with the financiers of the project;
AG Dangote Construction Company; Flour Mills of Nigeria Ltd and the Nigerian Ports Authority.

Mr Vaknin Harel, the Project Manager of the company, had earlier explained that RCC was filling several potholes caused by flooding, as well as filling the road with more durable materials to make the road last longer.

“The culverts are blocked from beginning to end, we need to fix new culverts,’’ Harel said.

Mrs Korede Keisha, Federal Ministry of Power, Works and Housing Engineer supervising the project, explained that the project was slowed down by the inability to relocate some gas pipes which were too expensive to move.

“We decided to shift the road about one metre from the gas pipe, since the contractor, AG Dangote, cannot excavate for drains, he is escavating for the roads,’’ Keisha said.

Tags: Fashola
Previous Post

Missing $49bn: Leave Saraki out, he is vindicated – Aide

Next Post

No Nigerian died in Hurricane Harvey – NIDO

Related Posts

NRS Engages KPMG As Concernrs Over Nigeria’s New Tax Laws Ease
Economy

NRS Engages KPMG As Concernrs Over Nigeria’s New Tax Laws Ease

January 13, 2026
Households Earning Less Than N250,000 Or Less Monthly Won’t Pay Tax-Oyedele
Economy

FG Reacts To KPMG’s Criticisms Of Multiple Errors, Gaps In Newly Enacted Tax Laws

January 10, 2026
Report Alleges Shortcomings Of Proposed Tax Reform Bills
Economy

KPMG Flags Errors, Gaps In Nigeria’s New Tax Laws

January 9, 2026
FG Intensifies Moves To Avert Looming Inflation Protests Amid Hide & Seek Game In Week Of Decision
Economy

Tax Reforms To Commence January 1, 2026, Taiwo Oyedele Insists, After Meeting President Tinubu

December 27, 2025
Next Post

No Nigerian died in Hurricane Harvey – NIDO

NRS Engages KPMG As Concernrs Over Nigeria’s New Tax Laws Ease

NRS Engages KPMG As Concernrs Over Nigeria’s New Tax Laws Ease

January 13, 2026
Uninspiring Super Eagles B Crash Out Of CHAN 2024, After 4-0 Defeat To Sudan

Super Eagles Beat Algeria 2-0 To Book AFCON Semi With Morocco

January 10, 2026
ASUU Blasts COPSON Over Comments On Collective Bargaining, Expresses Commitment To Quality Education

Relieve As FG, ASUU Seal Agreement On 40% Salary Increase Next Wednesday

January 10, 2026
MetroBusinessNews

© 2022 Metro Business News

Navigate Site

  • Contact Us
  • About Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate

© 2022 Metro Business News

Go to mobile version