• Contact Us
  • About Us
Tuesday, July 21, 2026
  • Login
MetroBusinessNews
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
MetroBusinessNews
No Result
View All Result
ADVERTISEMENT
Home News

Distribution network, big challenge to power supply in Nigeria- TCN Chief

metro by metro
March 19, 2019
in News
0
0
SHARES
0
VIEWS

Mr Usman Mohammed, the Managing Director, Transmission Company of Nigeria (TCN), has described the Distribution Companies (DISCOs) network as one of the major challenges confronting regular electricity supply to consumers in Nigeria.

Mohammed made this known on the sidelines of a Capacity Building Training Programme for Staff of Transmission Service Provider (TSP).

Read Also

Three Chinese Nationals Arrested Over Alleged Illegal Mining In Nasarawa

Gbajabiamila Appears Before ICPC Over Alleged Fake Presidential Agency Probe

Houthis Announce Saudi Naval Blockade, Threatening New Front In US-Iran War

It was organised by TCN and the National Power Training Institute in Nigeria (NAPTIN) on Monday in Lagos.

“That is why we are asking that attention should focus on expanding the distribution network, because this is where we have biggest challenge for generation.

“You have to understand that power industry is like a generator in the house.

“If you have a 20KVA generator in the house and the house is on 20 KVA wire, if the load is 5KVA, the generator will only generated 5KVA.

“Since the distributions don’t have capacity for 20KVA, it will only get 5KVA out.

“At present, some companies are willing to generate more, but we are not ready to collect, because ones you pick it, you must pay; but we cannot pay for what we are not using,” he said.

Mohammed said that the company had fixed many power lines that were not working in the last two years.

“We have fixed several lines that have been out for years.

“If you look at Kanji and Jebba, one line has been existing for over five years before we came in, but we have put the second line and both are working now.

“The same thing apply to Kaduna, Abuja and Ajaokuta in 2015 when they commissioned it, only one line is working, but we have fixed the second line.

“We have just procured four reactors to fix design problems between line in Jos, Makurdi and Ikot-Epene.

“We are not only fixing lines, we are also solving problems that exist in the network,” he said.

Also, Mr Ahmed Nagode, the acting Managing Director, NAPTIN, said that the institute was partnering with TCN to train their engineers on effective delivery of work.

Nagode said the institute has adequate facilities in place to make sure the engineers get the value for training.

He said that the 600 engineers scheduled for training were paid for by the TCN management.

Nagode urged the engineers to grab the opportunity provided by the training to establish themselves.

Tags: TCNTransmission Company of Nigeria
Previous Post

NCC’s priority is to ensure consumer protection, satisfaction — Danbatta

Next Post

GenCos release 3,982 MW of electricity to national grid

Related Posts

Three Chinese Nationals Arrested Over Alleged Illegal Mining In Nasarawa
News

Three Chinese Nationals Arrested Over Alleged Illegal Mining In Nasarawa

July 20, 2026
‘They Are After My Life, I’m Not Safe’ – Alleged Fake Presidential Council Boss Breaks Silence From Hiding
News

Gbajabiamila Appears Before ICPC Over Alleged Fake Presidential Agency Probe

July 20, 2026
Houthis Announce Saudi Naval Blockade, Threatening New Front In US-Iran War
News

Houthis Announce Saudi Naval Blockade, Threatening New Front In US-Iran War

July 20, 2026
Iran Threatens ‘Unforgettable Lessons’, As Two US Troops Killed
News

Iran Threatens ‘Unforgettable Lessons’, As Two US Troops Killed

July 19, 2026
Next Post

GenCos release 3,982 MW of electricity to national grid

Three Chinese Nationals Arrested Over Alleged Illegal Mining In Nasarawa

Three Chinese Nationals Arrested Over Alleged Illegal Mining In Nasarawa

July 20, 2026
‘They Are After My Life, I’m Not Safe’ – Alleged Fake Presidential Council Boss Breaks Silence From Hiding

Gbajabiamila Appears Before ICPC Over Alleged Fake Presidential Agency Probe

July 20, 2026
Houthis Announce Saudi Naval Blockade, Threatening New Front In US-Iran War

Houthis Announce Saudi Naval Blockade, Threatening New Front In US-Iran War

July 20, 2026
MetroBusinessNews

© 2022 Metro Business News

Navigate Site

  • Contact Us
  • About Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate

© 2022 Metro Business News

Go to mobile version