• Contact Us
  • About Us
Saturday, June 13, 2026
  • Login
MetroBusinessNews
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
MetroBusinessNews
No Result
View All Result
ADVERTISEMENT
Home News

Osinbajo visit site of collapded bridge on Ilorin – Mokwa – Jebba road

metro by metro
July 11, 2017
in News
0
0
SHARES
0
VIEWS

OsinbajoThe flow of vehicular traffic on the Ilorin-Mokwa-Jebba road would be normalized within two weeks according to Acting President Yemi Osinbajo, SAN.

Already the Federal Government has commenced work to make the road passable pending the commencement of work on re-construction of the collapsed Bakino bridge at Tatabu community near Mokwa in Niger State.

Read Also

Brotherhood In Action: Dekina Old Boys Set Agenda For School, Members At 2nd AGM, June 12

US Launches New Strikes After Trump Threatens To Attack Iran ‘Very Hard’ 

No One Is Doing NDC Favour, I Chose Not to Run — Dickson Rejects Attacks On Party

Prof. Osinbajo who visited the site for an on-the-spot assessment earlier today gave the assurance having received assurances from top government officials including Power, Works & Housing Minister, Mr. Babatunde Fashola and the contractors on site.

Specifically the Ag. President received briefs from relevant officials on site including the site engineers and supervisors from the Federal Ministry of Works. He  also embarked on a tour of the collapsed bridge.

Prof. Osinbajo then told newsmen at the site that government was fully committed to ending the difficulties on the Ilorin-Mokwa-Jebba road by addressing the remote causes of the deterioration on the road.

According to the Acting President, “the Minister of Works is working on a lasting solution but in the interim we have assurances from  the contractors and engineers working here that this road will be made passable in about a fortnight.’’

He assured that construction work on building a new bridge would commence but that it would take some time for it to be completed due to the slow movement of material from Ilorin to the site.

According to him, “The contractors have informed me that movement of material to this location would be difficult and slow because of the deplorable nature of the road but with the commitment and support of the Federal Road Safety Corps and other agencies, the job would be done in good time.’’

He added the Federal Ministry of Power, Works and Housing in collaboration with the Ministry of Transport were both working on a more lasting solution that will reduce the over -dependence on the highway especially by diverting the movement of heavy duty cargo from the roads to the railways.

While speaking to youths who had gathered at the site of the collapsed bridge, Prof. Osinbajo conveyed the greetings of President Muhammadu Buhari to the community and urged for patience while government’s efforts are in top gear to fix both the collapsed bridge and the road.

The Acting President was companies on the visit by Mr. Fashola, the Minister of Power, Works and Housing; the Governor of Niger State, Abubakar Bello, the Estu Nupe, HRH, Dr Yahaya Abubakar and other senior government officials.

Tags: Osinbajo
Previous Post

Court grants Dikko permission to travel abroad

Next Post

Sen. Melaye in trouble, recall process continues

Related Posts

DOBA Celebrates Nigeria’s Democratic Milestones On June 12, In Lagos
News

Brotherhood In Action: Dekina Old Boys Set Agenda For School, Members At 2nd AGM, June 12

June 11, 2026
US Excludes Nigeria, 17 Other Countries From 2025 Visa Lottery Scheme
News

US Launches New Strikes After Trump Threatens To Attack Iran ‘Very Hard’ 

June 11, 2026
NDC Fixes Presidential Form At N60m Ahead Of 2027 Elections
News

No One Is Doing NDC Favour, I Chose Not to Run — Dickson Rejects Attacks On Party

June 11, 2026
EFCC Bans Sting Operations At Night
News

EFCC Boss Says Some Governorship Aspirants Spent N30bn On Primaries 

June 11, 2026
Next Post

Sen. Melaye in trouble, recall process continues

2026 World Cup: Full Fixtures, Match Dates, Venues, Kickoff Times

June 11, 2026
Developing World’s ‘Complex’ Debt Could Raise Costs, Stall Restructuring, Lazard Says

Developing World’s ‘Complex’ Debt Could Raise Costs, Stall Restructuring, Lazard Says

June 11, 2026
Intermat 2027 Puts Nigeria, Africa At  Centre Of Global Drive For Sustainable Construction 

Intermat 2027 Puts Nigeria, Africa At  Centre Of Global Drive For Sustainable Construction 

June 11, 2026
MetroBusinessNews

© 2022 Metro Business News

Navigate Site

  • Contact Us
  • About Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate

© 2022 Metro Business News

Go to mobile version