• Contact Us
  • About Us
Saturday, June 6, 2026
  • Login
MetroBusinessNews
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
MetroBusinessNews
No Result
View All Result
ADVERTISEMENT
Home News

Baltimore Shipping Set To Resume By End Of April, Full Capacity By May

metro by metro
April 5, 2024
in News
0
Baltimore Shipping Set To Resume By End Of April, Full Capacity By May
0
SHARES
0
VIEWS

 

 

Read Also

Six Burnt To Death In Adamawa Auto Accident

US House votes for measure that would end Iran war, in blow to Trump

US Cuts Visa Processing Centres In Africa, Retains Lagos Embassy,  Excludes Abuja Office 

 

The U.S. Army Corps of Engineers said Thursday it expects to open a new channel to the Port of Baltimore by the end of April, freeing up commercial shipping blocked by a collapsed bridge, and then restore port access to full capacity by the end of May.

The main channel has been blocked by wreckage since the fully loaded container ship Dali lost power and rammed into a support column of the Francis Scott Key Bridge on March 26, killing six road workers and causing the highway bridge to tumble into the Patapsco River.
The Army Corps, part of a multiagency team responding to the Baltimore disaster, announced the plans one day ahead of a visit by President Joe Biden, saying that within four weeks the channel would be suitable for some roll-on/roll-off vessels that transport automobiles and farm equipment.

The Port of Baltimore ranks first in the United States for the volume it handles of autos and light trucks and farm and construction machinery, according to the state of Maryland.
Most of that traffic has been suspended since the accident, though some terminal operations outside the affected area have resumed.
Earlier this week, two auxiliary channels suitable for emergency vessels, tugs and barges were opened on either side of the disabled ship, which is stuck beneath bridge debris with thousands of containers and a crew of 21 sailors still aboard.
But with depths limited to 11 feet (3.35 meters) and 14 feet, those two channels are too shallow for major cargo ships, which need a depth of 35 feet.
“USACE expects to open a limited access channel 280 feet wide and 35 feet deep, to the Port of Baltimore within the next four weeks – by the end of April,” the corps said.

ALSO READ:More pains As NERC Jerks Up Electricity Tariff By More Than 300%
By the end of May, the corps said it expects to restore port access to its full capacity with a 700-foot-wide by 50-foot-deep navigation channel.
Before then, salvage crews must remove steel bridge debris from atop the Dali in order to extract it from the harbor, then clear the twisted metal and highway wreckage that fell into the water.
Ensconced within that debris are the bodies of four of the six highway workers who were killed.
The Biden administration has provided an initial $60 million in emergency funding to clear the channel and begin recovery, and Biden has said he would ask Congress to fund the complete rebuilding of the bridge.

Previous Post

Multilateral Development Banks launch joint tool to assess country Electronic Government Procurement (eGP) Systems

Next Post

We Will Bring Down Inflation Like We Did With Exchange Rate – Tinubu Assures Nigerians

Related Posts

Six Burnt To Death In Adamawa Auto Accident
News

Six Burnt To Death In Adamawa Auto Accident

June 4, 2026
US Excludes Nigeria, 17 Other Countries From 2025 Visa Lottery Scheme
News

US House votes for measure that would end Iran war, in blow to Trump

June 4, 2026
China, US Debt Woes May Dominate G7 Finance Chiefs’ Talks
News

US Cuts Visa Processing Centres In Africa, Retains Lagos Embassy,  Excludes Abuja Office 

June 2, 2026
Trump
News

Trump’s ‘Weaponization’ Fund Puts On Hold After Fierce Opposition From Congress

June 2, 2026
Next Post
Tinubu Expresses Sadness Over Ibadan Explosion, Says Miners Must Be Fished Out

We Will Bring Down Inflation Like We Did With Exchange Rate – Tinubu Assures Nigerians

WHO and China Strengthen Health Cooperation in Cabo Verde

June 4, 2026
Abbey Transitions To Commercial Bank Amid Calls For More Affordable Housing

Abbey Transitions To Commercial Bank Amid Calls For More Affordable Housing

June 4, 2026
Poland Score Late To Force Draw Against Nigeria In Friendly Match

Poland Score Late To Force Draw Against Nigeria In Friendly Match

June 4, 2026
MetroBusinessNews

© 2022 Metro Business News

Navigate Site

  • Contact Us
  • About Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate

© 2022 Metro Business News

Go to mobile version