• Contact Us
  • About Us
Monday, July 21, 2025
  • Login
MetroBusinessNews
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate
No Result
View All Result
MetroBusinessNews
No Result
View All Result
ADVERTISEMENT
Home Energy

Amid Lingering Power Generation Crisis NMDPRA Begins Review Of Gas License Holders 

metro by metro
July 17, 2025
in Energy
0
Amid Lingering Power Generation Crisis NMDPRA Begins Review Of Gas License Holders 
0
SHARES
0
VIEWS
The Nigerian Midstream and Downstream Petroleum Regulatory Authority (NMDPRA), on Wednesday in Abuja, kicked off a two-day performance review session with companies currently holding gas distribution licences.
A statement by the operator said the review is held in compliance with the provisions of the Petroleum Industry Act (PIA).
The PIA mandates the regulator review to ensure and monitor performance parameters of the industry and the quality of service provided by licensed operators.
According to NMDPRA, the review focused on regulatory compliance, operational efficiency and Health, Safety, Environment, and Compliance (HSE&C) standards of the licensed gas distribution activities.
The development comes as Nigeria grapples with low power generation, and the Federal Government is looking to ramp up gas production and usage in the country.
President of the Dangote Group, Alhaji Aliko Dangote, recently said there was no justification for Nigeria’s low power generation output, arguing that if his conglomerate alone can produce over 1,500 megawatts for internal use, the country should be generating far more.
Dangote made the remarks during a recent tour of the Dangote Refinery in Lagos, where he highlighted the company’s expanding energy footprint and called for deeper private sector involvement in power generation.
According to him, Nigeria should not be grappling with 4,500 to 5,000 MW of electricity; instead, it should generate up to 60,000 MW.
“We as a company alone are producing, group-wide for our consumption, over 1,500 MW.
“So, Nigeria should not be three times what we are producing as a country. Nigeria should be at about 50,000 MW to 60,000 MW,” Dangote said.
READ ALSO:DisCos Accounted For 100% Power Sector Casualties Q1-NERC
Nigeria currently generates about 5,000MW of electricity for its over 200 million population.
Dangote described what had been achieved at the refinery as proof that large-scale industrial projects were possible in Nigeria, including in the power sector.
“What we have done here just shows that there’s nothing impossible. All this can be replicated in our power sector. There’s no reason why Nigeria should be doing 5,000 MW,” he said.
The business mogul noted that building the refinery was more difficult than raising Nigeria’s power to 30,000 MW.
He added that building the country’s power infrastructure was not the exclusive responsibility of the government, pointing out that significant private sector participation was both necessary and achievable.
“What we have actually done here is much more difficult than making Nigeria 25,000 or 30,000 megawatts of power, with transmission and distribution. But it’s not the work of government alone,” he said.

 

Read Also

DisCos Accounted For 100% Power Sector Casualties Q1-NERC

Senate Passes Electricity Act Ammendment Bill To Tackle Sector Collapse

AEDC At It Again As Power Outage Hits Parts Of Abuja

Previous Post

DisCos Accounted For 100% Power Sector Casualties Q1-NERC

Next Post

NELFUND To Launch Job Portal To Help Student Loan Beneficiaries With Early Job Opportunities

Related Posts

NERC Threatens Tougher Sanctions Against DisCos Over Low Power Supply
Energy

DisCos Accounted For 100% Power Sector Casualties Q1-NERC

July 17, 2025
Senate
Energy

Senate Passes Electricity Act Ammendment Bill To Tackle Sector Collapse

July 9, 2025
AEDC Attributes Outages To Explosion, Technical Fault As Over 20 Communities Thrown Into Darkness During Easter
Energy

AEDC At It Again As Power Outage Hits Parts Of Abuja

June 25, 2025
LASG Warns Residents Of Ogun River Banks On Imminent Flooding
Energy

Lagos Issues Order To Regulate Electricity Market Operations

June 11, 2025
Next Post
Student Loan: NELFUND. Announces 14-Day Application Postponement For State Owned Institutions

NELFUND To Launch Job Portal To Help Student Loan Beneficiaries With Early Job Opportunities

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Zenith Retains Nigeria’s Best Tier-1 Capital Bank For Sixteenth Consecutive Yr In 2025 Top 1000 World Bank’s Ranking

Zenith Emerges Nigeria’s Standout Performer, Clinches Euromoney Awards For Excellence 2025 As Country’s Best 

July 21, 2025
Saudi’s ‘Sleeping Prince’ Dies At 36 After Spending 20 Years In Coma

Saudi’s ‘Sleeping Prince’ Dies At 36 After Spending 20 Years In Coma

July 20, 2025
Electoral Process Worsening, 2023 Elections Better Than Kogi, Edo, Imo Polls-Yiaga Africa

Electoral Process Worsening, 2023 Elections Better Than Kogi, Edo, Imo Polls-Yiaga Africa

July 20, 2025
MetroBusinessNews

© 2022 Metro Business News

Navigate Site

  • Contact Us
  • About Us

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Economy
  • Politics
  • News
  • Companies and Markets
  • Energy
  • Sports
  • Real Estate

© 2022 Metro Business News

Go to mobile version